Transportation

In 2014, the renovation project of Jiaxing Yu Anbo ARDEX products used in the logistics center. The construction area is 50000 square meters

PROLOGIS Jiaxing

The concrete ground originally loose many crack and peeling phenomenon, by repairing ARDEX products, the problem has been resolved, the construction period in a short period of 25 days

PROLOGIS Jiaxing

Jiaxing logistics park, also known as Jiaxing modern comprehensive logistics park, consists of two logistics functional areas north and south, planning control area of about 10000 acres, of which about 6000 acres south, north area of about 4000 acres.

PRODUCTS USED

Transportation

TERMS OF USE PRIVACY POLICY CONTACT US SITEMAP

© ARDEX Group 2017 – 2018

    姓名*

    电话*

    电子邮件*

    城市*

    公司*

    职业*

    消息内容*